August 19, 2017
building 19

Building 19 is an 110,000 square foot manufacturing and distribution facility built-to-suit the requirements of Corporate Express Document & Print Management (CEDPM).

The building, which was completed in October, 2006, provides a case study where both TIMING and FLEXIBILITY were critical to satisfying the needs of CEPDM for their new and expanded Fresno Operations. What started out as a simple request for a proposal from Corporate Express to purchase land in North Pointe eventually culminated in December 2005 (through multiple iterations) into a build-to-suit, long term lease arrangement, including options to extend the lease term, expand the lease premises, and purchase the lease premises at the end of the lease term.

Highlights of the building and transaction are:

· Regional manufacturing, sales and distribution headquarters

· 10 months from groundbreaking to occupancy

· Plans to expand by 50,000 contiguous square feet

· Site designed and configured to suit CEDPM's current and future needs

· Attractive architecture

Please contact the Marketing Team for more information.

next: building 20 and 21

The information contained herein has been obtained from sources we deem reliable. We have no reason to doubt its accuracy but we do not guarantee it. All information should be verified prior to purchase or lease.